0 completed projects
Specialised Service for the Upgrade of Triconex Emergency Shutdown Systems in the Punta de Mata Division, Monagas State.
Transport and Equipment Services for Works at the Amana Operations Centre, Punta de Mata Division.
Packaged Meal Service for Operational and Administrative Personnel of the Eastern Production Executive Directorate.
Comprehensive Service for Evaluation and Reconditioning of Crude Oil Production Wells to Improve the Production Profile of the Punta de Mata Division (EF Amana).
Strategic Alliance between PDVSA Petróleo, S.A. and Venecia & Service, C.A. (Allied Partner).
Comprehensive Well Cleaning Service (Well Testing) — Eastern Region of PDVSA Servicios Petroleros, S.A., Furrial Front.

Comprehensive Well Cleaning Service (Well Testing) — Eastern Region of PDVSA Servicios Petroleros, S.A., Punta de Mata Front.

Comprehensive Well Cleaning Service (Well Testing) — Eastern Region of PDVSA Servicios Petroleros, S.A.

Construction of a 10,000-Barrel Tank and Rehabilitation of the Potable Water System at Campo Rojo Facilities, Punta de Mata Division.

Installation of Turbocompressors No. 3 and 4 at Musipan 01.

Construction of a ø 26" Gas Pipeline to Interconnect the Musipan Compressor Plant with the NIF-Muscar and Jusepin–Muscar Gas Pipelines. Project: Installation of Turbocompressors No. 3 and 4 at Musipan 01.

Construction of Foundations for an Additional Compression Train at the Musipan 01 Compressor Plant. Project: Installation of Turbocompressors No. 03 and 04 at Musipan 01.

Civil Works for the Third Compression Train at Musipan 01. Project: “Expansion of Gas Compression Capacity to 450 PSIG and 60 PSIG at Punta de Mata.”

250-MMSCFD Relief and Vent Flare Stack — Phase I: Interconnection Facilities.
Vacuum Equipment Supply Service.
Vacuum Equipment Supply Service.
Construction of Compost Pavement at the Sugar Cane Derivatives Agro-industrial Complex, Monagas State.
Framework Contract for the Construction of Six (6) PDVALITO Retail Food Outlets in the North-Eastern Region.
Maintenance of Turbocompressors at the Santa Bárbara ACCRO Extraction Plant, Monagas State.
Plant Shutdown — Major Maintenance of Train “A” at the Santa Bárbara ACCRO Extraction Plant, Monagas State.
Major Maintenance and Tank Construction at the San Joaquín 1 (SJED-1) and San Joaquín 4 (SJED-4) Discharge Stations, Gas Anaco District, Anzoátegui State.
Emergency Major Maintenance of Process Train “B” at the Santa Bárbara ACCRO Extraction Plant, Monagas State.
Construction of the Vapour Recovery Electrical Sub-station, Flare M-04 Facilities, and Automation of Module 5 and Cascade Systems at the Jusepín Complex, Monagas State.
Preventive and Corrective Maintenance of Air Compression Systems at MUSCAR, COA Compressor, COT Compressor and PIAMO Plants — Plant Management, Punta de Mata District, Monagas State.
Expansion and Construction of the Main Pumping Station, Jusepín Complex, Monagas State.
Improvements to Crude Oil Dehydrators at the Jusepín Complex, Monagas State.
Reconditioning and Rehabilitation of Flow Lines, Process Lines, Oil Pipelines and Gas Pipelines in the Punta de Mata District — Lot No. 02, U.E. Pirital.
Major Maintenance of Bolted Tanks 1501 and 1502, and Upgrade of the Saltwater Injection System Shelter at Aguasay Main Station.
Pumping Unit Maintenance Service at the Stations of the Eastern Operational Coordination Management.
Construction of Major Enclosures (Shelters) for Wells at PDVSA Jusepín – El Furrial.
Maintenance Services for Crude Oil Storage Tanks at the Santa Bárbara Flow Station, Pirital — Monagas State.
Dismantling of Flare M-05, Jusepín Complex, Monagas State.
Centralisation of the Saltwater Injection Plant at Mata-R Station. Construction of 2,500-Barrel Welded Tanks, Cantaura — Anzoátegui State.
Plant Shutdown — San Joaquín Extraction Plant, Anzoátegui State.
Automation of Production Stations and Supply of Energy Systems for the Gas Condensate Exploitation Unit (Stations SAED-3 and SJED-3), Anaco — Anzoátegui State.
Major Maintenance of the Grounding and Lightning Protection System at the Travieso Tank Farm, Rebombeo 1 and 2.
Preventive and Corrective Maintenance of the Compressor Plant at COT Operations Centre, Punta de Mata District, Monagas State.
Installation of Grounding Systems in Automation Shelters for Wells of the UB Pirital.
Automation of Production Stations and Supply of Energy Systems at Stations SAED-3 and SJED-3 of the Gas Condensate Exploitation Unit.
Upgrade of the Grounding System at Bared-10 Station.
Fusion Splice Joints, OTDR Measurement, Fibre Attenuation Testing and Commissioning of a 12-Core Fibre Optic Cable.
Replacement of Sulfatreat II Beds — C.O.M.
Installation of Coalescent Filters at the Amine Plant and Sulfatreat I System, Muscar Complex.
Automation of Compressor Plant Installations at the Jusepín Complex, Monagas State.
Construction and Installation of Grounding for Automation of Wells in U.E. Carito.
Expansion of the Grounding System at Carito and Musipan Stations.
Installation of Atmospheric Discharge Dissipation Systems (DAS) at Santa Bárbara Flow Station.
Installation of Atmospheric Discharge Dissipation Systems (DAS) on Eight Crude Oil Tanks at the Anaco Tank Farm.
Installation of Field Instrumentation at Santa Bárbara Flow Station.
Study of Grounding Systems at Flow Stations in the Anaco District.
Study of Grounding Systems at the San Tomé District Office Tank Farm.
Services for Conduit Installation, Cable Laying, Wiring, Signal Connection, and Equipment Relocation and Fixing.
Supply and Installation of DAS Lightning Discharge Dissipation Systems at Flow Stations COT, Amana, Carito, Musipan and Muri — Northern Monagas Area.
Repair of Motocompressor K-1 at the Caico Seco II Gas Plant.
Calibration and Certification of Field Instrumentation on Trains A and B of the Santa Bárbara Cryogenic Plant.
Installation of Instrumentation for the M.V.S. Project at the Santa Bárbara Cryogenic Plant.
Installation of Atmospheric Discharge Dissipation Systems (DAS) at Flow Stations: Carito, Amana, Muri, Musipan and COT.
Vapour Recovery from Northern Monagas Flow Stations. Installation of Alfajol Fencing at El Tejero Flow Station (COT).
Relocation of Junction Boxes and Electrical Conduits for Tanks at Carito Flow Station.
Supply and Installation of Identification Labels on 21 Wells in the Northern Monagas Area.
Automation of Production Train Control Valves at Carito Flow Station.
Wiring and Connection of Six Pressure Transmitters at the Travieso Tank Farm, El Tejero.
Training Course on Grounding Systems and Lightning Protection — San Tomé.
Design and Implementation of an Electronic Equipment Grounding Grid (CHEM-ROD Electrodes) for Gas Operations at El Tejero Operations Centre.
Reinforcement of Electronic Equipment Grounding Grid with CHEM-ROD Chemical Electrodes (CR-4) for Communications and Antenna Equipment — S/E San Tomé III.
Reinforcement of Electronic Equipment Grounding Grid with CHEM-ROD Chemical Electrodes (CR-4) for Communications and Antenna Equipment — S/E Sisor.
Design and Implementation of an Electronic Equipment Grounding Grid (CHEM-ROD) for the Compression Control Room at Muscar Complex.
Design and Implementation of an Electronic Equipment Grounding Grid (CHEM-ROD) for the PIGAP Project Control Room at Muscar Complex.
Recovery of 16" Diameter Pipeline Sections at KM 90 on the Old Anaco – San Mateo Highway.
Replacement and Re-routing of Pipelines at Tamanaco Pumping Station.
Flow Line Laying in the Sanvi Guere Area — Pipelines ø 2", 3", 4", 6" and 8".
Repair of the 16" Las Palmas – KM 27 Oil Pipeline Using a Welded Sleeve.
Design and Implementation of a Power Grounding System with CHEM-ROD Electrodes for Electronic Equipment — Travieso Tank Farm, El Tejero.
Design and Implementation of an Electronic Equipment Grounding Grid at Aguasay I Plant.
Integration of the IMPACC System with a Texas Instruments PLC for Starting and Stopping Crude Pumps at El Tejero and Carito Operations Centres.
Design and Implementation of a Power Grounding System with CHEM-ROD Electrodes for Limitorque Actuators — El Tejero Operations Centre.
Construction of Instrumentation Conduits for Automation of Motocompressor K-8, Zapatos Plant.
Re-routing of Electronic Flow Transmitters for Gas Volume Measurement at the Outlet.
Design and Implementation of an Electronic Equipment Grounding Grid at Santa Rosa II Plant.
Design and Implementation of an Electronic Equipment Grounding Grid at Plant 5.
Design and Implementation of an Electronic Equipment Grounding Grid at Zapatos Plant.
Recovery and Transport of 20 km of 16" Diameter Pipeline from the Old Anaco–Puerto La Cruz Highway to Valle de la Pascua.
Design and Implementation of an Electronic Equipment Grounding System with CHEM-ROD Electrodes — Rebombeo II Station.
Design and Implementation of an Electronic Equipment Grounding System for Wells FUC-1 and FUC-2.
Production Services in the Quiamare La Ceiba Area.
Repair and Commissioning of Storage Tanks at Quiamare-2 Flow Station.
Construction of Four (4) Beam Pump Foundations.
Location Grading for Well QG-25.
Transport, Installation and Start-up of the Beam Pump for Well QG-21 (materials included).
Transport, Installation and Start-up of the Beam Pump for Well QG-3.
Repair and Grading of the Quiamare Access Road and Bridge.
Grading and Compaction of Flinco 33 (materials included).
Location Grading and Beam Pump Assembly at Well QG-30.
Location Grading for Wells QG-21 and QG-3.
Assembly of AIB Unit at Well QG-17.
Materials Transportation Services.
Assembly and Disassembly of the Beam Pump at Well QG-21.
Construction of Six (6) Beam Pump Foundations.
Access Road Grading to Quiamare and Location Preparation at QG-24 (materials included).
Construction of a Perimeter Concrete Base for Drilling Rig Flinco 33.
Supply, Installation and Commissioning of PLC-based Protection Systems for 12 Pumps at the Sweetening Plant, Muscar Complex.
Wiring and Integration of PLC SI 565/545 at NMEF-2 (Carito).
Installation and Testing of Electrical Wiring and Connection of Motors for Turbines 1, 2 and 3 at the Amana Compressor Plant.
Development of Multi-screen Displays NMEF-3, Integration of 10 Wells into CONMEF-3, and Control Tuning of NMEF-4.
Recovery of Valves and Fittings at Santa Bárbara Station.
Integration of Production Train No. 2 into the Operations Centre via Placement, Connection and Identification of 3×16 AWG Cable.
Installation of the High-Pressure Interlock System on the Three-Phase Sweetening Plant.
Installation of Electric Level Controls and Rest Columns with 1" Drain Connections (Calibration and Start-up).
Interconnection of Channels A and B of the Limitorque Master Station, Loading of API Tables and PLC SI 565 Database.
Supply of Instrument Technicians and Electricians for Engineering and Maintenance Work in Zone 4.
Installation of Anti-asphaltene Chemical Injection Pumps on Inlet Manifolds at NMFE 1 and 4 Stations (Musipan, Tejero).
Station Start-up — NMEF-2 Coolers: Instrumentation Sequences, Field Testing and Shutdown System Start-up and Verification.
Laying, Installation and Commissioning of Instrument Air Piping for Storage Tanks.
Reconditioning of Multi-use Courts.
Installation, Start-up and Commissioning of Float-type Level Gauges at NMEF-2 (Carito).